Article Image
News Link • Science

David Leblanc on Thorium Advantage

• arclein
The French Molten Salt Fast Reactor design with a faster neutron spectrum needs a great deal of starting fissile material (typically 5 to 10 tonnes per GWe) whereas a well moderated (lots of graphite) design is typically 1.5 tonnes and as little as 0.5 tonnes. As

Join us on our Social Networks:


Share this page with your friends on your favorite social network:

Purse.IO Save on All Amazon Purchases