Kitegen Testing 3 Megawatt System
• arcleinThe prototype in the Province of Asti which works with 9 generators and up to 10,000m generates a peak power of 27 MW. A park of Kitegens with100 MW peak power should produce 500 GWh/year; enough for 86,000 households.



